Not known Details About site acceptance test procedure
Initiate the boot-up course of action for engineering and operator workstations as per the producer’s Directions.Not a test although the Fats protocol is a document that outlines the procedures that should be adopted over the SAT. This document need to be reviewed and signed by all parties linked to the SAT. It must also be followed in the overal